Description: Repair maint of retaining wall near MT of HQ IGAR E at Srikona Name of Work REPAIR MAINT OF RETAINING WALL NEAR MT OF HQ IGAR EAST AT SRIKONA
Details: Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kinds of soil. Providing and laying in position cement concrete 1:4:8 using stone agg 40mm nominal size excluding the cost of centering and shuttering - All work up to plinth level. Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with CM 1:6. Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, c
Sector: Police and Internal Security