Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. filling available excavated earth (e/c rock) in trenches, plinth sides of foundation etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 1.5 m providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nomina
Sector: Medical Education