Details: schedule ‘a’ part-i civil work (schedule of items) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos/ lindane emulsifiable concentrate of 20% diluting and injecting chemical emulsion for post-constructional anti-termite treatment (e
Sector: Police and Internal Security