Details: (a) ground floor earth work earthwork in excavation foundation trenches or drains including dressing of sides and ramming of bottoms and including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.(a) lift upto 1.5 m (b) lift above 1.5 m to 3 m filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm.in depth, consolidating each deposited layer by ramming and watering lead upto 50 metres lift upto 1.5 metre. supplying and filling in plinth with sandy soil under floors including,watering,ramming consolidating and dressing complete with a lead of 15 km concrete work providing and laying cement concrete works in foundation and plinth excluding the cost of centering & shuttering in (a) 1:5:10 (1 cement :4 kanhaighat coarse sand :8 graded stone aggrt. 40mm nominal size). reinforced cement concrete work providing and laying in position specified grade of reinfo
Sector: Police and Internal Security