Details: clearing road side/median open lined/ pucca drains to bring them to original shape, drainage capacity including disposal of sediments, extraneous debris and vegetation growth blocking the free flow from site outside row with all leads and lifts complete in all respects as directed by the engineer.ln-charge and as per maintenance standards cause no. 3.1(frequency of cleaning in urban areas will be quarterly whereas in rural areas, it will be twice in a year i.e. before and after monsoon). removal of rank vegetation/weeds and undesirable vegetation from shoulders, embankment slopes upto row (both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside row as per direction of engineer-in-charge and as per maintenance standards clause 3.3 (frequency will be once in a quarter)a) shoulders including side slopes of embankment upto toe line on both sides of the carriageway. (frequency of cleaning will be four
Sector: Road development