Description: Providing and Laying of Brick on edge Flooring at entrance and laying of Paver Blocks at Campus of MIT Girls Hostel MU Name of Work Providing and Laying of Brick on edge Flooring at entrance and laying of Paver Blocks at Campus of MIT Girls Hostel MU
Details: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer. A) In area of light jungle Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Grading-II Material Providing and laying factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm t
Sector: University