Details: surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift upto 1.5 m. taking 1 m extra on both sides. all kinds of soil. earth work in excavation by mechanical means(hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, liftup to 1.5mincluding getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m and lift upto 1.5m, as directed by engineer-in-charge. all kinds of soil. centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level. reinforced cement concrete gauge post of size 15cmx10cm (one side tapered in 5
Sector: Water Resource Department