Description: Construction of training hall cum primary processing centre under Mission Jackfruit at CCS Tura Name of Work Construction of training hall cum primary processing centre under Mission Jackfruit TIC at College of Community Science CAU Tura
Details: Earthwork in excavation in foundation trenches,including dressing of sides and ramming of the bottom i/c stacking of serviceable stones,disposal and removal of excation earth within a lead of 50m and lift of 1.50m complete as directed. (a) all kinds of soil ( ordinary soil/hard soil/dense soil) Plain cement concrete works in foundation bed for footing steps, walls, brick works etc below plinth level as directed and specified i/c dewatering if necessary and curring complete ( shuttering where necessary shall be measured and paid separately).(a) 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Providing for steel reinforcement in RCC work i/c cutting,bending,cranking and tying in position with binding wire,20 gauge,as shown in drawings,complete upto floor two level. (ii) Tor steel. Providing centering and shutteringi/c strutting , propping etc and removl of form for all heights complete and as directed by Engineer in charge. (a)Foundation, footings, base
Sector: Agriculture Misc