Details: schedule - a supply of 8.0 mt long pcc pole supply of stay set complete supply of stay insulator lt supply of strended g.i wire (7/2.5sqmm) supply of lt shackle insulator (3x3.5) supply of acsr (6/1/2.59mm2) supply of 8swg gi wire supply of straps nuts & bolts supply of nuts & bolts (12x300mm) cost of single phase service connection materials upto 35 mtrs of length (pvc cable, 32 amps cut-out, gi wire, reel insulator etc as required) of 8.0 mtr long pcc/ s.t poles direct in earth in/c excavation , refilling ramming etc. as required. the pole should be burried 1/6th of it`s length. of painted stay set complete direct in earth in/c excavation , refilling ramming etc. as required as per direction of the engg.in charge. of lt shackle insulators with nuts & bolts etc as required. laying & stringing of 1km (single conductor) acsr, 6/1/2.59 mm dia 'weas
Sector: Distribution