Details: 11.1 300 excavation for structuresa. without dewatering. earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1 includingsetting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i ordinary soil(i) upto 3 m depth 9.9 1100 & 300 backfilling in foundation trenches as per drawing and mord technical specification clause 1108. (i) sand filling rate as per item no.11.2.i of chapter 11. 11.4. 800, 900 & providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & mord technical specifications clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforceme
Sector: Urban Authority