Details: operation maintenance and upkeep of existing running condition mini surface water treatment plant of 0.15 mgd/per capacity for production of safe drinking water & supplying the treated water in morning and evening, at least 2(two) hours each time through existing distribution system by way of engaging trained operator, helper, watch & word. supplying required chemical after laboratory test for purification and disinfection of raw water, repairing / replacing of worn out parts or the whole of the damaged electrical and mechanical equipments of the plant of the intake, removing siltation of intake, periodical cleaning of cwr and back washing of filter bed daily etc. complete in all respect as per direction of the engineer-in-charge ( rate includes all operation, chemicals, repairs / replacement, watch & word etc. including the cost of alum.
Sector: Water supply and Sewerage