Description: WSS JJM Sch undr KBN RD Blk SH Prvdng drnkng wtr hndwshng fclty suplyng instltn plythyln wtr storg tnk othr allid wrks at dffrnt schls AWCs undr DWS SD KBN 2023 24 Name of work Water Supply scheme under JJM Scheme under Kakraban RD Block SH Providing drinking water and hand washing facility supplying and installation of polyethylene water storage tank and other allied works at different school and AWCs under DWS Sub Division Kakraban during the year 2023 2024
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil cum Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil Providing and laying cement concrete in retainin
Sector: Water supply and Sewerage