Details: surveys & investigations topographical surveys topographical survey information, benchmarks, contour maps etc of proposed sewage pumping station plot and the area of intercept of nallah, over flow weir complete for all components of works of sewage pumping station of 5 mld capacity. soil investigations soil investigations, geo technical investigations of proposed sewage pumping station plot and the area of intercept of nallah, over flow weir complete for all components of works of sewage pumping station of 5 mld capacity. detailed design & drawings submission and approval of basic engineering package including designs, layout, p&id, hydraulic flow drawing, design & hydraulic calculations, working drawings including all layout, sections, typical details, shop drawings, as built drawings ..etc complete for all components of works like sewage pumping station of 5 mld alongwith allied works including all auxillary buildings / structures and all allied works as mentioned in tender document
Sector: Smart City