Details: without dewatering.earthwork in excavation for structures as per drawing and mord technical specifications clause 305.1, including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.i) ordinary soilii) upto 3m death. sand filling in foundation trenches as per drawing & mord technical specification clause 305.9,1200.i. sand filling providing concrete for plain concrete using jhama brick aggregate in open foundation complete in/c formwork as per drawing & mord technical specification clause 802,803,900, 1202 & 1203. (in/c centering shuttering stagging etc but ex/c reinforcement)i) pcc grade m10 (using jhama brick brick aggregate)a) nominal mix 1:3:6 (hand mixing) brick mesonary work in cement mortar in sub-structure complete except pointing and plastering, as per drawing & mord technical specification clauses 602, 603, 604,
Sector: Urban Authority