Details: dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. dismantling old glass panes from wooden / steel structures including stacking of serviceable materials and disposal of and unserviceable materials to the dumping ground with all leads and lifts etc.complete as per direction of the engineer- incharge. dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for replastering or re-pointing including disposal of to the dumping ground with all leads and lifts etc.complete as per direction of the engineer- incharge. dismantling g.i. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of engineer-in-charge : 14.28.1 15 mm to 40 mm nominal bore. half brick masonry work with first class bricks insuperstructure upt
Sector: School