Details: dismantling old plaster or pointing, ranking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of to the dumping ground with all leads and lifts etc. complete as per direction of the engineer-in charge. demolishing gs sheet roofing including ridges, hips,valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and up to a lead of 50m etc. complete as per direction of the engineer-in- charge providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all work up to plinth level, 1:2:4 (cement :2 fine sand : 4 graded well burnt brick aggregate 20mm nominal size) half brick masonry work with first class bricks in superstructure up to floor five level including cost of all materials as required complete :- a) in cement mortar 1 : 4 (1 cement : 4 fine sand ) providing corrugated g.s sheet roof
Sector: Police and Internal Security