Details: demolishing brick work including stacking ofserviceable materials and disposal of unserviceablematerials with all lifts and upto a lead of 50m etc.complete as per direction of the engineer- in-charge:-in cement mortar. demolishing cement concrete manually / bymechanical means including disposal of materialwith all lifts and upto 50 m lead etc. complete as perdirection of the engineer- in-charge:-nominal concrete 1:3:6 or richer mix (i/c equivalentdesign mix) dismantling gs sheet roofing including ridges, hips,valleys, gutters wind ties etc. including dismemberingand stacking of serviceable materials andunserviceable materials separately with all lifts andupto a lead of 50 m etc.complete as per direction ofthe engineer- in-charge. providing structural steel work in single section fixedwith or without connecting plate including cutting,hoisting, fixing in position and applying a priming coatof approved steel primer all complete as required. providing corrugated g.s. sheet roofing includ
Sector: School