Description: Raising and widening of embankment by earth filling Double layer soling C C Block Toe wall along with other allied works at ch 0 65 km to 1 30 km Group No II Name of work Strengthening of Belonia Town Embankment L 3 18 KM by raising and widening of existing embankment for protection of Belonia Town area under Belonia Municipal Council during the year 2025 26 S H Raising and widening of embankment by earth filling Double layer soling C C Block Toe wall along with other allied works at ch 0 65 km to 1 30 km Group No II
Details: Construction of embankment with approved materialobtained from borrow pits with a lift upto 1.5 m,transporting to site, spreading, grading to required and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 5000 m as per MoRD Technical Specification Clause 301.5. Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.1)Flat Brick soling Furnishing and laying of the live sods of perennial turf forming grass on embankment , verges or other locations shown on the dra
Sector: PWD