Details: dismentalling of pump for over hauling including greasing, gland packing, necessary repairs & reinstallation of the same including trail run for 10 hrs. in two spell complete as per direction of the engineer-in-charge. dismentalling of motor for vernishing,heatinf etc . complete in/c reinstallation of and trail run for 10 hrs. in two spell complete as per direction of the engineer-in-charge. repairing of 20/25 h.p starter by dismantling including changing of magnet coil,connected plate,finger etc spare parts whichever needed as per direction of the engineer-in-charge. repairing of 200 amps main switch including changing necessary spare parts such as h.r.c fuse,gang,guide,feeder,nuts,bolts,etc whichever needed as per direction of the engineer-in-charge. repairing of busbar box including changing necessary burnt spares and copper strips etc as per direction of the engineer-in-charge. providing & fitting fixing pvc suction hose pipe overall thickness 5mm of best quality at site of wor
Sector: PWD