Description: Repairing works in the Central Instrumentation Centre Name of Work Repairing works in Central Instrumentation Center Tripura University
Details: SCAFFOLDING WORK13.2 Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for workingplatform etc. and maintaining it in a serviceablecondition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of workat required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of 13.5 Cleaning of chocked sewer line by diesel running vehicle mounting hydraulic operated high pressure suction jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jettin
Sector: University