Details: earthwork in excavation for stuctures as per drawing and mord technical specification clause 305.1 including setting out construction of shoring & bracing removal of stumps & other deleterious material and ddisposal upto a lead of 50 m dressing of sides & bottom and backfilling in trenches with excavated suitable material 1.ordinary soil filling in foundation trenches as pern drawing & mord technical specification clauses 305.3.9,1200 sand filling. providing concrete for plain concrete (using jhama brick aggregate) in open foundation complete including formmm work per draawingss & mord technical specifications clauses 802,803,903,1202 and 1203 (icluding centering shuttering staging etc excluding reinforcement) p.c.c grade m10 (using jhama beick aggregate) nominal mix 1:3:6(hand mixing) brick masonry work cement mortar in foundation complete excluding pointing & plastering as per drawing & mord technical specification clauses 600,1202 & 1203. ii brick masonry in 1:4 cement mortar. pla
Sector: Municipality