Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. desilting of earth, silt, garbage, slush and other solid deposits etc. from the existing canal mannually to bring it to the required section for smooth flow in the canal including disposal of excavated material outside of the canal with a lead of 50 m. and all lifts including execution of work in or under water, liquid mud and under foul conditions including the cost of taking care of canal section. dewatering of stagnent or flowing or seepage water/sludge/liquid marsy entering into the canal from any sources as equired for satisfactory execution of work including taking out the excavated material outside the canal as per directions of engineer-in-charge. disposal of excavated materials, such as earth, silt, garbage, slush and other solid depos
Sector: PWD