Details: construction of embankment with material obtained from borrow pits. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per mord technical specification clause 301.5 construction of subgrade and earthen shouldersconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 as per mord technical specification clause 303.1 brick edging laid length wiseproviding and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and crosssection shown on the drawing, filling joints with earth, free from clay with a plasticity index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kn as
Sector: Urban Authority