Description: SH a Construction of Approach road along with side wall Up gradation of existing brick soling road to RCC road Part II b Construction of Water tank c Construction of Toilet Block Name of Work Development of Infrastructure on Floriculture unit Udaipur Progeny Orchard Gakulpur Gomati Tripura S H a Construction of Approach road along with side wall Up gradation of existing brick soling road to RCC road Part II b Construction of Water tank c Construction of Toilet Block
Details: Earth Work : Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, liftupto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil Filling available excavated earth (excluding rock) in trenches,plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil First class brick work in foundation and plinth including cost of all materials as required complete.In cement mortar 1:4 (1 cement : 4 fine sand). Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required , ramming, consolidating and compac
Sector: Agriculture Dept