Details: operation of plant by deploying pump operator and helper for operation of intake well, chlorinator, clari-floculator, alum dosing, back washing & cleaning of total plant as per requirement in/c operation of s/valves as per direction of the engineer-in-charge. i. pump operator ii. helper repairing of v.t. pumps by providing and replacing of g.m. bushfor (conforming to is : 1710) as per specification and the direction of the engineer-in-charge.i) for 40000 / 50000 gph capacity v.t. pump. repairing of v.t. pumps by providing and replacing of g.m. bushfor suction case / discharge case (conforming to is : 1710) as per specification and the direction of the engineer-in-charge. i) for 40000 / 50000 gph capacity v.t. pump repairing of v.t. pumps by providing and replacing of rubber bushfor (conforming to is : 1710) as per specification and the direction of the engineer-in-charge.i) for 40000 / 50000 gph capacity v.t. pump repairing o
Sector: Water supply and Sewerage