Details: earthwork in excavation by mechanical means (hydraulic excavator)/- manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottom, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required , ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. providing and laying dry flat brick flooring in required pattern complete providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -all work upto plinth level:1:3:6 ( 1 cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) first class brick work in foundation and plinth incl
Sector: Urban Authority