Details: 4.1.3 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). 4.3.3 centring and shuttering including strutting propping etc. and removal of form work for - columns, piers, abutments, pillars, posts and struts. 9.1.2q providing wood work in frames of doors, windows, clerestory windows and other frames , wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paidfor separately) - vegesa / bandaru wood. 9.5.1.1q providing and fixing panelled or panelled and glazed shutters for doors, windows, and clerestory windows, including isi marked m.s.pressed hinges bright finished of required size with necessary screws, excluding panelling which will be paid for separately , all complete - vegesa / bandaru wood - 35 mm thick shutters. 9.7.1
Sector: PWD