Details: 2.27c.1 supplying and filling with gravel (excluding rock) in layers not exceeding 20cm in depth , breaking clods , watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes capacityincluding all leads and lift (payment will be made based on level measurement). 4.91b providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling with smooth three wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite crushable type such as moorum / gravel for screening and gravel for binding to fill up the interstices of coarse aggregate, watering and compacting to the required density - by manual means - water bound macadam gr-i with gravelscreening. (as per morth pecification, 4th revision) 4.92c providing, laying, spreading and compacting s
Sector: District Administration