Details: collection and supply of coarse sand (zone iii) including stacking to standard department gauge for pre-measurement at work site as directed by the engineer-in-charge. collection and supply of portland cement including stacking to standard department gauge for pre-measurement at work site as directed by the engineer-in-charge. collection and supply of common burnt clay f.p.s (non modular) bricks class designation 7.f.p.s bricks class designation at work site as directed by the engineer-in-charge. collection and supply of fine sand (zone iv) including stacking to standard department gauge for pre-measurement at work site as directed by the engineer-in-charge. hire charges for h/c of concrete mixer 0.25 to 0.40 with hopper complete collection and supply of (needle type 40mm) at work site as directed by the engineer-in-charge collection and supply of red oxide zinc chromate primer at work site as directed by the engineer-in-charge collection and supply of structural steel such as tees
Sector: RDPR