Description: CONSTRUCTION OF CULVERT AND FORMATION OF 3rd MAIN ROAD AT BEZAWADA GARDENS YANAM Name of Work Construction of culvert and formation of 3rd main road at Bezawada Gardens Yanam
Details: 15.2.1: Demolishing cement concrete manually / by mechanical means including disposal ofmaterial within 50 metres lead - nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 2.6.1: Earth work in excavation by mechanical means (Hydraulic excavation) / manual meansover areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil 2.27: Supplying and filling in plinth with river sand under floors, including watering ,ramming consolidating and dressing complete 4.1.10: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size) 5.1.2: Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement - All work
Sector: District Administration