Description: Providing G I Chain link fencing all round the Ladies Hostel blocks at Zone B campus of RIVER Name of Work Providing G I Chain link fabric fencing all round the Ladies hostel blocks at Zone B campus of RIVER
Details: Code No.2.8.1 Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m - all kinds of soil Code No. 4.3.1 Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns Code No.4.4.1 Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing - 1:2:4 (1cement :2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Code No. 10.25.1 Steel work welded in built up sections framed work , including cutting ,hoisting, fixing in position and applying a priming coat of approve
Sector: Research center