Description: Construction of Toilet block at Sri Parvatheeswarar Temple Ambagarathur Name of Work Construction of Toilet block at Sri Parvatheeswarar Temple Ambagarathur
Details: Earth work in excavation by mechanical means (Hydraulic excavation) / manual means over areas exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m Extra for every additional lift of 1.5m or part there of in excavation / banking excavated or stacked materials - all kinds of soil Supplying and filling in plinth with river sand under floors, including watering ,ramming consolidating and dressing complete Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) Extra for providing a
Sector: Religious building