Description: Sub Work. I. Sinking of a new borewell and supply, erection and commissioning of motor and pumpset at AYUSH Hospital Campus, Villianur, Puducherry. Sub Work. i. Sinking of a New borewell at AYUSH Hospital Campus, Villianur, Puducherry.--Name of Work: Construction of 50 bedded Integrated AYUSH Hospital at Villianur, Puducherry. Sub Work(I): Sinking of a new borewell and supply, erection and commissioning of motor and pumpset at AYUSH Hospital Campus, Villianur, Puducherry. Sub Work(i): Sinking of a New borewell at AYUSH Hospital Campus, Villianur, Puducherry.
Details: Earthwork in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m - all kinds of soil. Supply of Quarry rubbish including stacking to department gauge for premeasurement and spreading required thickness. Drilling of borewell any where in Pondicherry including tranportation in alluvial soil, sedimentary strata of clay, sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method, including fuel, labour for drilling, bentonite mud, water required for drilling at the site, contruction of mud pit (water available within a lead of 1.5Km) using rotary rig. -Upto 60 mts depth ending below ground level
Sector: PWD