Description: Road Work
Details: Code No. 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared.charges etc completeCode No. 30.7 Supply of Quary including stacking to department gauge for premeasurement and spreading required thickness as directed by the Engineer-in-chargeNON PSR (Code No. 2.4) Add for rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20cm in depth.
Sector: Trade Development