Description: Protecting left bank of Noolar in downstream side of Nallambal regulator and fencing area for Garden maintenance at Nallambal village in Thirunallar commune Name of Work Protecting left bank of Noolar in downstream side of Nallambal regulator and fencing area for Garden maintenance at Nallambal village in Thirunallar commune
Details: Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) Centering and shuttering including strutting , propping etc and removal of form for - foundations, footings, bases of columns etc for mass concrete Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) Centering
Sector: PWD