Details: demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal ofunserviceable material within 50 metres lead as per direction of engineer-in-charge.- in cement mortar earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, includinggetting out the excavated soil and disposal of surplus excavated soil as per direction of engineer-in-charge , within a lead of 50m - all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pila
Sector: District Administration