Details: earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of engineer-in-charge , within a lead of 50m - all kinds of soil close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (measurements to be taken of the face area timbered) . depth not exceeding 1.5m close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (measurements to be taken of the face area timbered) . depth exceeding 1.5m but not exceeding 3m extra for every additional lift of 1.5m or part there of in excavation / banking excavated or stacked materials - all kinds of soil supplying and filling in plinth with river sand under floors, including watering, ra
Sector: PWD