Details: providing and laying unscreened gravel boulders to a specified consolidated thickness for sub base course including stacking of the material to the departmental gauge on road side for premeasurement. the volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. the rate shall including labour charges for spreading and hand packing to required camber and graded, and rolling with power roller hire and fuel charges for all tools and plants employed, and the cost of the boulders etc complete as directed by the engineer in charge. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth three wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite crushable type such as moorum/gravel for screening and gravel for binding to fill up the