Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. supplying and filling with red earth (excluding rock) including cost and conveyance to the work site and stacking to the departmental gauge , spreading in layers not exceeding 20cm in depth , watering and consolidation using 0.5 tonne roller , or wooden or steel rammers etc. complete for making play fields , running tracks and court yards. providing and laying unscreened gravel boulders to a specified consolidated thickness for sub base course including stacking of the material to the departmental gauge on road side for premeasurement. the volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. the rate shall including labour charges for spreading and hand packing to r
Sector: District Administration