Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. providing and laying unscreened gravel boulders to a specified consolidated thickness for sub base course including stacking of the material to the departmental gauge on road side for premeasurement. the volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. the rate shall including labour charges for spreading and hand packing to required camber and graded, and rolling with power roller hire and fuel charges for all tools and plants employed, and the cost of the boulders etc complete as directed by the engineer in charge. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform t
Sector: District Administration