Details: scarifying the existing granular road surface to a depth of 50mm and disposal of scarified material within all lifts and leads upto 1000 metres - by manual means earthwork in excavation of foundation of structure as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remainging earth locally for road work - by mechanical means - depth upto 3m (ordinary soil) cement concrete 1:4:8 mix with stone aggregate 40mm nominal size in foundation upto a depth of 1.5 metres below ground level and upto height of 1.5 above ground/bed level providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work: using coarse aggregate and fine aggregate,portand pozzolana / ordinary portland / portland cement, admixtures in recommended proportions as
Sector: PWD