Details: demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge. - nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) disposal of debries / surplus excavated earth including loading, unloading and conveyance to low lying areas with in 2 km lead as directed by the engineer-in-charge. earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including ressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of engineer-in-charge , within a lead of 50m - all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size)
Sector: District Administration