Details: code:no:3.11:- removal of unserviceable soil including excavation, loading and disposal upto 1000 m lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. code : no; 2.8.1: earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil code:no:30.7 supply of quarry including stacking to department gauge for premeasurement and spreading required thickness code:no:4.1.10 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size) code:no:4.1.5 providing and laying in position c
Sector: District Administration