Details: desilting the canal by removing silt, slush and debries from the bed of the drain removing the grass , buses etc., complete in unhygenic and foul condition including disposal of the same within an average lead of 1km without polluting the environment by manual means. earth work in rough excavation over area not exceeding 30 cm thick and dressing up in embankaement by using machinery for roads , flood banks , marginal banks and guide banks on filling up ground depression within a initial lead of 50 m and lift upto 6m in all kinds of soil engaging tractor on hire basis for disposing the debries removing vegetation and other materials collected form the site and as directed by the engineer – in – charge. the rate includes cost of all hire and running charges of machinery operating staff and all other incidental charges etc., complete. hire charges for engaging hitachi-60/70 for desilting, cleaning, clearing the vegetation and floating materials and loading into the vehicles for disposal
Sector: PWD