Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. providing and laying unscreened gravel boulders to a consolidated thickness of 15 cm for sub base course inlcuding conveyance of site, loading unloading inloading and stacking to departmental guage on road side for premeasurement and spreading watering, power rolling etc., complete. the volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the quantity. the rate to include labour charges for spereading and hand packing to required camber and gradient, power rolling hire and fuel charges for all tools and plants employed, diversion of traffic barricading arrangements etc., completes diretced by the engineer-in-charge. providing, laying, spreading and compacting stone aggregates of speci
Sector: District Administration