Details: 20.2.2 boring, providing and installing bored piles of grade m-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring , with bentonite solution and temporary casing of appropriate lenghth for setting out and removal of same and the lenghth of the pile to be embedded in the pile cap etc. all complete , including removal of excavated earth with all lifts and leads (length of pile for payment shall be measured upto ottom of pile cap) - 400 mm dia piles cast -in-situ reinforced cement concrete. 2.8.1 earthwork in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds
Sector: PWD