Details: clearance of land slides (slip clearance) clearance of land slides in soil and ordinary rock by a bull-dozer d 80 a-12, 180 hp and disposal of the same on the valley side complete as directed by the engineer-in-charge. excavation in foundation for retaining, walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications clause 305.1 of mord specifiction providing and laying of mechanically woven double twisted hexagonal shaped gabions (zinc plus pvc coated), of size 3mx1mx1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (the work includes filling boulders in the gabions). random rubble stone masonry laid in 1:6 cement and sand mortar, in walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour,
Sector: PWD