Details: earth work in excavation by mechanical means (hydraulic excavator) / manualmeans over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal of excavated earth leadupto 50 m and for all lift, as directed by engineer-in-charge all kinds of soils filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-iii): 6 graded stone aggregate 40 mm nominal
Sector: Tourism