Description: RequestforQuotation RFQ Name of Work jkT kstuk o kZ 2023 24 ds vUrZxr tuin ikSM h x oky ds fo kkulHkk ks eds oj esa xaxk unh esa dksVh ekyk ds lehi Ms ysu Dykl yksfM ax lsrq dk uofuekZ k dk Z izFke pj k RFQ oa TOR ds vuqlkj
Details: Geological investigation and submission of report, Hydrological investigation,Analysis and Design including prepration and submission of design report, Topographic survey, traffic survey (if required) and prepration of 4 No. Longitudinal section & cross section for site selection and prepration of final GAD after site selection and Other drawings as required,Geotechnical investigation, carrying out the required sub soil exploration and laboratory test inclding prepration and submission of report,prepration of design and drawing of Foundation and Sub structure including submission of design report and drawing in hard and soft copy formats including vetting, prepration and submission of various DPR reports (Inception report, Preliminary project report,Draft detailed project report, Final detailed project report), prepration of land Acquisition cases Including forest land transfer case, Other Miscellaneous Items of 1.50 lane Class-'A' Loading Bridge on Ganga River near Koti Mala in cons
Sector: PWD