Description: construction of physics Chemestry and Biology lab at GIC Salyana under Ramsa Name of Work lexz f k kk ds varxZr fo0 k M d kZiz kx ds jk0b0dk0 lfy k kk esa HkkSfrd tho oa jlk u fo Kku iz kssx kkyk Hkou dk fuekZ k dk ZA
Details: Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for all Kinds of soil by the direction in Engineer - in - charge work to be execuated as per specification a rate of above given item Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). of specified grade -All work upto plinth level excluding the cost of centring and shuttering - by the direction in Engineer - in - charge work to be execuated as per specification a rate of above given item Random rubble masonry with Cement mortar 1:6 (1 cement : 6 coarse sand) with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (
Sector: Rural Misc